User Tools

Site Tools


phase1:phase1

This is an old revision of the document!


mTCA System Test Configuration

Layer Module Connector POH position POH i2c address FED fiber FED ch ROC ids Module ID
L1 29 112 1 0x11 poh1 41 1,2 (1,2),(3,4) (12-15), (0-3) M1001
L1 28 112 1 0x11 poh1 41 3,4 (5,6),(7,8) (4-7), (8-11) M1001
L1 31 113 4 0x11 poh3 41 13,14 (25,26),(27,28) (12-15), (0-3) M1097
L1 30 113 4 0x11 poh3 41 15,16 (29,30),(31,32) (8-11), (4-7) M1097
L2 23 212 2 0x11 poh2 41 5,6 (9,10),(11,12) (0-7), (8-15) M2100
L4 7 412 3 0x13 poh1 41 12 (23,24) (0-15) M3650
L4 27 413 3 0x13 poh1 41 9 (17,18) (0-15) M3639
L4 14 414 3 0x13 poh1 41 10 (19,20) (0-15) M3519

Modules

Module Configuration L1, L2 and L34:

TBM10 (L1): hub ids 30+31
TBM09 (L2): hub ids 3, 28, 30, 15, 23
TBM08c (L3/L4): hub ids 1, 24, 25, 26
TBM08b (L3/L4): hub id 31

Scheduling

Please schedule your testing time with the VME system in the UZH CMS Phase 1 BPIX Systemtest calendar:
https://calendar.google.com/calendar/embed?src=3kv7ujkppvt29uj0bnpldm25d0%40group.calendar.google.com&ctz=Europe/Zurich

Testing

Git repository

Important notes

  • VME FEC needs to be connected to slots 19-21 in the VME crate since those do not have the -5V connector!

Software

Firmware

How to

Components

Mapping

Manuals

Counting room:

Supply tube electronics:

On detector:

DTB:

Power and AUX cabling:

Schematics

PCB Drawing

Test Results

Links

Results

Related Talks and Documents

Project Reviews

Our group's talks

2016

2015

2014

Other talks and Documents

phase1/phase1.1529500426.txt.gz · Last modified: 2018/06/20 15:13 by leac