Layer | Module | Connector | POH position | POH i2c address | fiber | FED ch | ROC ids |
---|---|---|---|---|---|---|---|
L1 | 31 | 113 | 4 | 0x11 poh3 | 5,6 | (1,2),(3,4) | (12-15), (0-3) |
L1 | 30 | 113 | 4 | 0x11 poh3 | 7,8 | (5,6),(7,8) | (8-11), (4-7) |
L2 | 3 | 214 | 6 | 0x11 poh4 | 9,10 | (9,10),(11,12) | (0-7), (8-15) |
Note that we swapped the fibers such that we can read the above configuration on piggy switch 0 instead of switch 1.
Please schedule your testing time with the VME system in the UZH CMS Phase 1 BPIX Systemtest calendar:
https://calendar.google.com/calendar/embed?src=3kv7ujkppvt29uj0bnpldm25d0%40group.calendar.google.com&ctz=Europe/Zurich
Counting room:
Supply tube electronics:
On detector:
DTB:
Power and AUX cabling:
2016
2015
2014
FPIX Portcard testing
POH
Workshops