CMS BPIX Detector Commissioning at PSI
Schedule
Testing procedure
Connect cables and fibers
CCU and opto power (upper cable for sectors 1-4, lower cable for sectors 5-8)
Temperature sensors (BmO/BpO upper for sector 1-4, BmO/BpO lower cable for sector 5-8)
Module LV and HV (S*-L14 to Cable L14, S*-L23 to Cable L23)
Optical fibers (tkFEC, pxFEC, FED 1-5)
Verify that cooling sytem is running
Verify that temperature and humidity reading are as expected
Power on CCU and opto power
CCU: 2.5V (expected current about 1.4A) [Slot 9 CCU]
Opto: 2.5V (expected current about 3A per sector) [Slot 7 OPTO 1,2,3,4 for S4,3,2,1 (upper cable), for S5,6,7,8 (lower cable)]
Power on module:
Start POS
How to run POS
source TriDAS_r45/pixel/POSRelease/setenv.sh
cd TriDAS_r45/pixel/PixelRun
./run.sh --xml auto
go to http://cmspixel2.psi.ch:1973/
click on "PixelSupervisor"
click "Initialize"
select calibration to run
click "Configure"
check that FED phases have been found
click "Start"
Once the calibration finished. Look at the results in:
cd TriDAS_r45/pixel/PixelRun/Runs/Run_0/Run_yourrunnr
Elog
Keep track of your results by entering them in this elog:
(user and password are the same as to access testing PC).
https://elog.physik.uzh.ch:8080/PixelPOS/
Enter sector, run number and calibration and additional information if needed.
mTCA specifics