 ===== Power ===== ===== Power =====
  
-  * Check implementation of enabling/disabling of single DCDC converter pairs or layers in BPixelTools 
   * Check power pigtails in system   * Check power pigtails in system
-  * Implement readback of module current in BPixelTools 
  
  
 ===== Full chain test ===== ===== Full chain test =====
  
-  * Check change in current as a function of module Vana setting 
-  * Check functionality of RDA passing for CB L3 and L4 (currently not possible due to broken L4 connector) 
   * Implement procedure for full chain test including all tests we did so far: CCU redundancy, i2c programming, DOH/PLL setting, Delay25 scan for SDA, Delay25 scan for RDA, ...   * Implement procedure for full chain test including all tests we did so far: CCU redundancy, i2c programming, DOH/PLL setting, Delay25 scan for SDA, Delay25 scan for RDA, ...
   * Check LV and HV distribution   * Check LV and HV distribution
   * Check that reset does not trigger cross-talk   * Check that reset does not trigger cross-talk
   * Implement reading of QPLL pia register   * Implement reading of QPLL pia register
 +
  
  
Line 30: Line 27:
 ===== Optical signals ===== ===== Optical signals =====
  
-  * Cross check ADC calibration and slope measurement against ETH+  * Perform BER
  
 ===== Hardware ===== ===== Hardware =====
  
   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.
-  * Test CB L3+  * Test CB L4
   * Test POHs   * Test POHs
  