User Tools

Site Tools


phase1:phase1:todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
phase1:phase1:todo [2016/05/31 08:48] – [Power] leacphase1:phase1:todo [2016/09/28 14:06] (current) – [Optical signals] leac
Line 7: Line 7:
 ===== Power ===== ===== Power =====
  
-  * Check implementation of enabling/disabling of single DCDC converter pairs or layers in BPixelTools 
   * Check power pigtails in system   * Check power pigtails in system
-  * Implement readback of module current in BPixelTools 
  
  
 ===== Full chain test ===== ===== Full chain test =====
  
-  * Check change in current as a function of module Vana setting 
-  * Check functionality of RDA passing for CB L3 and L4 (currently not possible due to broken L4 connector) 
   * Implement procedure for full chain test including all tests we did so far: CCU redundancy, i2c programming, DOH/PLL setting, Delay25 scan for SDA, Delay25 scan for RDA, ...   * Implement procedure for full chain test including all tests we did so far: CCU redundancy, i2c programming, DOH/PLL setting, Delay25 scan for SDA, Delay25 scan for RDA, ...
   * Check LV and HV distribution   * Check LV and HV distribution
   * Check that reset does not trigger cross-talk   * Check that reset does not trigger cross-talk
   * Implement reading of QPLL pia register   * Implement reading of QPLL pia register
 +
  
  
Line 30: Line 27:
 ===== Optical signals ===== ===== Optical signals =====
  
-  * Cross check ADC calibration and slope measurement against ETH +  * Perform BER
-===== Mechanical ===== +
- +
-  * Bend flex cables as much as possible and see if they still function electrically +
-  * Survey temperatures on components+
  
 ===== Hardware ===== ===== Hardware =====
  
-  * test adapter prints for modules 
   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.
-  * Make power pigtails +  * Test CB L4 
-  * Make & test board to inject signals simultaneously+  * Test POHs
  
-===== Software =====+===== Pixel Online Software =====
  
-  * Install Phase 1 POS+  * Implement modules for L1, L2, L34 
 +  * Check reading from FIFO3 (to use calibrations implemented by pilot) 
 +  * Implement POH bias scan using TBM header counting (for given TBM/ROC delay settings) 
 +  * Run S-curve and compare noise to module test
phase1/phase1/todo.1464677283.txt.gz · Last modified: 2016/05/31 08:48 by leac