This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| vacuum_controll [2026/05/09 12:17] – [Starting Procedure] ari | vacuum_controll [2026/05/09 12:36] (current) – [Pressurization Checklist] ari | ||
|---|---|---|---|
| Line 6: | Line 6: | ||
| ===== Depressurization Checklist ===== | ===== Depressurization Checklist ===== | ||
| - | 1) | + | - Ensure that cryocooler is off and cryostat is at room temps! |
| - | 2) Turn on main power switch on HiCube Eco 80 | + | |
| - | 3) Wait for DCU to complete self-test of system | + | |
| - | 4) Check if venting is off under parameter 012 “Enable vent” => off | + | |
| - | 5) Turn on roughing pump: Select parameter 010 “Pumping station” => on | + | |
| - | 6) Once we reach pressures !!< 5 mbar!!, select parameter 023 “ motor pump” and turn on turbomolecular pump | + | |
| - | 7) | + | |
| + | |||
| + | |||
| + | |||
| + | |||
| + | ===== Pressurization Checklist ===== | ||
| + | |||
| + | - Turn cryocooler off and wait for temperatures to reach ~ 280 K | ||
| + | - Turn off Turbomolecular pump and wait for RPMs to go to zero | ||
| + | - Turn off roughing pump | ||
| + | - Vent the system | ||
| ===== TPG 361 ===== | ===== TPG 361 ===== | ||