User Tools

Site Tools


phase1:phase1:todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
phase1:phase1:todo [2016/09/04 11:28] – [Power] leacphase1:phase1:todo [2016/09/28 14:06] (current) – [Optical signals] leac
Line 27: Line 27:
 ===== Optical signals ===== ===== Optical signals =====
  
-  * Measure ETH POH class 3 in system test (eye diagram after receiver) 
   * Perform BER   * Perform BER
  
Line 33: Line 32:
  
   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.
-  * Test CB L3+  * Test CB L4
   * Test POHs   * Test POHs
  
phase1/phase1/todo.1472981289.txt.gz · Last modified: 2016/09/04 11:28 by leac