This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
phase1:phase1:todo [2016/09/04 11:28] – [Power] leac | phase1:phase1:todo [2016/09/28 14:06] (current) – [Optical signals] leac | ||
---|---|---|---|
Line 27: | Line 27: | ||
===== Optical signals ===== | ===== Optical signals ===== | ||
- | * Measure ETH POH class 3 in system test (eye diagram after receiver) | ||
* Perform BER | * Perform BER | ||
Line 33: | Line 32: | ||
* Power and load board: equip L12 CB with power cables. Measure voltage drops for L12. | * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12. | ||
- | * Test CB L3 | + | * Test CB L4 |
* Test POHs | * Test POHs | ||