User Tools

Site Tools


phase1:phase1:todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
phase1:phase1:todo [2016/07/04 10:37] – [Power] leacphase1:phase1:todo [2016/09/28 14:06] (current) – [Optical signals] leac
Line 8: Line 8:
  
   * Check power pigtails in system   * Check power pigtails in system
-  * Implement readback of module current in BPixelTools 
  
  
Line 28: Line 27:
 ===== Optical signals ===== ===== Optical signals =====
  
-  * Cross check ADC calibration and slope measurement against ETH+  * Perform BER
  
 ===== Hardware ===== ===== Hardware =====
  
   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.
-  * Test CB L3+  * Test CB L4
   * Test POHs   * Test POHs
  
phase1/phase1/todo.1467621438.txt.gz · Last modified: 2016/07/04 10:37 by leac