This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
phase1:phase1:todo [2016/07/04 10:37] – [Full chain test] leac | phase1:phase1:todo [2016/09/28 14:06] (current) – [Optical signals] leac | ||
---|---|---|---|
Line 7: | Line 7: | ||
===== Power ===== | ===== Power ===== | ||
- | * Check implementation of enabling/ | ||
* Check power pigtails in system | * Check power pigtails in system | ||
- | * Implement readback of module current in BPixelTools | ||
Line 29: | Line 27: | ||
===== Optical signals ===== | ===== Optical signals ===== | ||
- | * Cross check ADC calibration and slope measurement against ETH | + | * Perform BER |
===== Hardware ===== | ===== Hardware ===== | ||
* Power and load board: equip L12 CB with power cables. Measure voltage drops for L12. | * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12. | ||
- | * Test CB L3 | + | * Test CB L4 |
* Test POHs | * Test POHs | ||