To Do List

Power

  • Check implementation of enabling/disabling of single DCDC converter pairs or layers in BPixelTools
  • Check HV distribution to module

Full chain test

  • Check change in current as a function of module Vana setting
  • Check functionality of RDA passing for CB L3 and L4 (currently not possible due to broken L4 connector)
  • Implement procedure for full chain test including all tests we did so far: CCU redundancy, i2c programming, DOH/PLL setting, Delay25 scan for SDA, Delay25 scan for RDA, …
  • Check LV and HV distribution

Digital FED

  • Look at module data with digital FED
  • Set module in no-token pass mode and check if we only see TBM header and trailors
  • Test new FEDs and piggy

Optical signals

  • Repeat optical performance measurements using analog FED
  • Repeat ADC calibration using scope
  • Perform measurements at cold

Mechanical

  • Bend flex cables as much as possible and see if they still function electrically
  • Survey temperatures on components

Hardware

  • make adapter prints for modules
  • make board to check power distribution
  • make board to inject signals simultaneously

Software

  • Install Phase 1 POS