This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| phase1:phase1:todo [2016/07/04 10:38] – [Optical signals] leac | phase1:phase1:todo [2016/09/28 14:06] (current) – [Optical signals] leac | ||
|---|---|---|---|
| Line 8: | Line 8: | ||
| * Check power pigtails in system | * Check power pigtails in system | ||
| - | * Implement readback of module current in BPixelTools | ||
| Line 28: | Line 27: | ||
| ===== Optical signals ===== | ===== Optical signals ===== | ||
| - | * Measure ETH POH class 3 in system test (eye diagram after receiver) | ||
| * Perform BER | * Perform BER | ||
| Line 34: | Line 32: | ||
| * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12. | * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12. | ||
| - | * Test CB L3 | + | * Test CB L4 |
| * Test POHs | * Test POHs | ||