User Tools

Site Tools


phase1:phase1:mtcafull

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
phase1:phase1:mtcafull [2016/07/12 14:45] – [Initialize ST electronics] leacphase1:phase1:mtcafull [2017/02/15 15:36] (current) – [Hardware configuration] leac
Line 5: Line 5:
   PXFEC 0, ring 0x0   PXFEC 0, ring 0x0
   FED1   FED1
-  Module hub address 31 (TBM08c) connected to CBL12 CON 212 +  
-  Using POH2 channel 0x11 +
-  Connected to FED fiber 5+
  
  
Line 33: Line 31:
          
 ==== Configure AMC13 ==== ==== Configure AMC13 ====
-  cd FEDTools+  cd FEDtool
   amc13test settings/HWDescription.xml   amc13test settings/HWDescription.xml
      
Line 65: Line 63:
   ./run.bsh   ./run.bsh
   > exec data/d1.ini   > exec data/d1.ini
 +  
 +  
 +
phase1/phase1/mtcafull.1468327543.txt.gz · Last modified: 2016/07/12 14:45 by leac