phase1:phase1:mtcafull [2016/07/12 14:39] – [Initialize ST electronics] leacphase1:phase1:mtcafull [2017/02/15 15:36] (current) – [Hardware configuration] leac
Line 2: Line 2:
  
 ==== Hardware configuration ==== ==== Hardware configuration ====
- +  TKFEC 0, ring 0x0, CCU 0x7c 
-  Module hub address 31 (TBM08c) connected to CBL12 CON 212 +  PXFEC 0, ring 0x0 
-  Using POH2 channel 0x11 +  FED1 
-  Connected to FED fiber 5+  
  
  
Line 31: Line 31:
          
 ==== Configure AMC13 ==== ==== Configure AMC13 ====
-  cd FEDTools+  cd FEDtool
   amc13test settings/HWDescription.xml   amc13test settings/HWDescription.xml
      
Line 38: Line 38:
   ./run.bsh   ./run.bsh
   > reset   > reset
 +  > piareset all
   > scanccu   > scanccu
   > ccu 0x7c   > ccu 0x7c
 +  > channel 0x11
 +  > delay25 init
 +  > delay25 set d0 0
 +  > delay25 set d1 39 
 +  > delay25 set d2 10
 +  > delay25 set d3 0 
 +  > pll reset
 +  > pll init
 +  > doh init
 +  > i2c 0x11 0x8 30
 +  > i2c 0x11 0xb 63
 +  
 +The commands above are also implemented in a script:
 +  cd TriDAS/pixel/BPixelTools/testRDB
 +  python init.py
 +  
 +  
 +==== Initialize the module ====
 +
 +  cd TriDAS/pixel/BPixelTools/pxfec
 +  ./run.bsh
 +  > exec data/d1.ini
 +  
 +  
 +
phase1/phase1/mtcafull.1468327173.txt.gz · Last modified: 2016/07/12 14:39 by leac