User Tools

Site Tools


phase1:phase1:todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Last revisionBoth sides next revision
phase1:phase1:todo [2016/09/04 11:28] – [Power] leacphase1:phase1:todo [2016/09/04 11:28] – [Hardware] leac
Line 33: Line 33:
  
   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.
-  * Test CB L3+  * Test CB L4
   * Test POHs   * Test POHs
  
phase1/phase1/todo.txt · Last modified: 2016/09/28 14:06 by leac