User Tools

Site Tools


phase1:phase1:todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
phase1:phase1:todo [2016/07/04 10:37] – [Power] leacphase1:phase1:todo [2016/09/04 11:28] – [Hardware] leac
Line 8: Line 8:
  
   * Check power pigtails in system   * Check power pigtails in system
-  * Implement readback of module current in BPixelTools 
  
  
Line 28: Line 27:
 ===== Optical signals ===== ===== Optical signals =====
  
-  * Cross check ADC calibration and slope measurement against ETH+  * Measure ETH POH class 3 in system test (eye diagram after receiver) 
 +  * Perform BER
  
 ===== Hardware ===== ===== Hardware =====
  
   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.   * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12.
-  * Test CB L3+  * Test CB L4
   * Test POHs   * Test POHs
  
phase1/phase1/todo.txt · Last modified: 2016/09/28 14:06 by leac