This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
phase1:phase1:todo [2016/02/24 11:45] – [Modules] leac | phase1:phase1:todo [2016/09/04 11:28] – [Hardware] leac | ||
---|---|---|---|
Line 7: | Line 7: | ||
===== Power ===== | ===== Power ===== | ||
- | * Check implementation of enabling/ | + | * Check power pigtails |
- | * Check HV distribution to module | + | |
===== Full chain test ===== | ===== Full chain test ===== | ||
- | * Check change in current as a function of module Vana setting | ||
- | * Check reading of RDA signal with pxFEC | ||
- | * Check functionality of RDA passing for CB L3 and L4 (currently not possible due to broken L4 connector) | ||
* Implement procedure for full chain test including all tests we did so far: CCU redundancy, i2c programming, | * Implement procedure for full chain test including all tests we did so far: CCU redundancy, i2c programming, | ||
* Check LV and HV distribution | * Check LV and HV distribution | ||
+ | * Check that reset does not trigger cross-talk | ||
+ | * Implement reading of QPLL pia register | ||
+ | |||
Line 23: | Line 22: | ||
===== Digital FED ===== | ===== Digital FED ===== | ||
- | * Look at module data with digital FED | + | * Check TBMPLL delay settings |
- | * Set module in no-token pass mode and check if we only see TBM header and trailors | + | |
- | * Test new FEDs and piggy | + | |
===== Optical signals ===== | ===== Optical signals ===== | ||
- | * Repeat optical performance measurements using analog FED | + | * Measure ETH POH class 3 in system test (eye diagram after receiver) |
- | * Repeat ADC calibration using scope | + | * Perform |
- | * Perform | + | |
- | ===== Mechanical ===== | + | |
- | + | ||
- | * Bend flex cables as much as possible and see if they still function electrically | + | |
- | * Survey temperatures on components | + | |
===== Hardware ===== | ===== Hardware ===== | ||
- | * make adapter prints | + | * Power and load board: equip L12 CB with power cables. Measure voltage drops for L12. |
- | * make board to check power distribution | + | * Test CB L4 |
- | * make board to inject signals simultaneously | + | * Test POHs |
- | ===== Software ===== | + | ===== Pixel Online |
- | * Install Phase 1 POS | + | * Implement modules for L1, L2, L34 |
+ | * Check reading from FIFO3 (to use calibrations implemented by pilot) | ||
+ | * Implement POH bias scan using TBM header counting (for given TBM/ROC delay settings) | ||
+ | * Run S-curve and compare noise to module test |