This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
phase1:phase1:runber [2016/07/13 09:57] – leac | phase1:phase1:runber [2016/07/13 09:57] – leac | ||
---|---|---|---|
Line 23: | Line 23: | ||
cd TriDAS/ | cd TriDAS/ | ||
./run.bsh | ./run.bsh | ||
- | > initFitelN\\ | + | > initFitelN |
| | ||
- | * Connect UZH L3 Testboard with LVDS input signal connected | + | |
- | * Connect a POH with fiber 2 connected to L3 position | + | |
- | + | ||
- | + | ||
- | CON880A: Data OUT: Ethernet cable going to UZH L3 Testboard | + | |
- | CON500C: Data IN: Ethernet cable coming from FED | + |