This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
phase1:phase1:runber [2016/07/13 09:56] – leac | phase1:phase1:runber [2016/07/13 09:57] – leac | ||
---|---|---|---|
Line 23: | Line 23: | ||
cd TriDAS/ | cd TriDAS/ | ||
./run.bsh | ./run.bsh | ||
- | > initFitelN | + | > initFitelN\\ |
| | ||
- | * Connect a POH with fiber 2 connected to L3 position | + | * Connect UZH L3 Testboard with LVDS input signal connected |
- | | + | * Connect a POH with fiber 2 connected to L3 position |
- | | + | |
- | * Use buttons on BER testboard to inject data | + | |
+ | | ||
+ | | ||