This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
phase1:phase1:runber [2016/07/13 09:55] – leac | phase1:phase1:runber [2016/07/13 09:57] – leac | ||
---|---|---|---|
Line 23: | Line 23: | ||
cd TriDAS/ | cd TriDAS/ | ||
./run.bsh | ./run.bsh | ||
- | > initFitelN | + | > initFitelN\\ |
| | ||
- | * Use buttons on BER testboard | + | * Connect UZH L3 Testboard with LVDS input signal connected |
+ | * Connect a POH with fiber 2 connected | ||
+ | |||
+ | |||
+ | CON880A: Data OUT: Ethernet cable going to UZH L3 Testboard | ||
+ | CON500C: Data IN: Ethernet cable coming from FED | ||