This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
phase1:phase1:runber [2016/07/13 09:54] – leac | phase1:phase1:runber [2016/07/13 09:57] – leac | ||
---|---|---|---|
Line 6: | Line 6: | ||
CON880A: Data OUT: Ethernet cable going to UZH L3 Testboard | CON880A: Data OUT: Ethernet cable going to UZH L3 Testboard | ||
- | CON500C: Data IN: Ethernet cable coming from FED | + | CON500C: Data IN: Ethernet cable coming from FED |
* Turn on CCU and opto power | * Turn on CCU and opto power | ||
Line 23: | Line 23: | ||
cd TriDAS/ | cd TriDAS/ | ||
./run.bsh | ./run.bsh | ||
- | > initFitelN | + | > initFitelN\\ |
| | ||
- | * Connect | + | * Connect |
- | * Data OUT: Ethernet cable going to UZH L3 Testboard | + | * Connect a POH with fiber 2 connected to L3 position |
- | | + | |
+ | |||
+ | CON880A: | ||
+ | | ||