User Tools

Site Tools


phase1:phase1:pos

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
phase1:phase1:pos [2016/09/13 12:00] ngadiubaphase1:phase1:pos [2016/09/14 11:24] ngadiuba
Line 120: Line 120:
   tkfecconfig   0   tkfecconfig   0
   lowvoltagemap   0   lowvoltagemap   0
-    + 
-===== Run full calibration chain (to be finished) =====+5) edit the calib.dat file with the input parameters of the new calibration (ex: what to scan, scan range, etc..). For the example above the file should stay under **config/calib/25/calib.dat**     
 + 
 + 
 +   
 +===== Calibration sequence ===== 
 + 
 +The calibration sequence is described in [[https://indico.cern.ch/event/560056/contributions/2292179/attachments/1330727/1999885/phase1-calibrations.pdf|this]] presentation. 
 + 
 +The calibrations parameters can be found in the corresponding calib.dat file in the config/calib directory (check the config/aliases.txt file to know which subfolder you should look at) 
 + 
 +A detector configuration for switch 0 and switch 1 of the fitted receiver to use for testing calibrations can be found in [[https://elog.physik.uzh.ch:8080/Pixel/168|this elog entry]]
phase1/phase1/pos.txt · Last modified: 2016/09/14 11:25 by ngadiuba