User Tools

Site Tools


phase1:phase1:bpixeltools

This is an old revision of the document!


Table of Contents

BPixelTools

Setup

Turn on crate
Turn on power for CCU ring (2.5V)
Turn on power for DC-DC converters (10V)
Login to cmspixel PC

FEC-CCU

Start the server:

 cd TriDAS/pixel/BPixelTools/ccu
 source setup.bsh
 ./run.bsh
 help // to get a list of options when using the command line interface

Run the test program (from a different terminal):

 cd TriDAS/pixel/BPixelTools/
 source setup.bsh
 cd test
 python testCCUandDCDC.py <ccuaddress>

Analog FED

Start the server:

 cd TriDAS/pixel/BPixelTools/fed
 source setup.bsh
 ./run.bsh

Check that addresses are set correctly in fed/data/fed_parameters.dat and fed/data/fed.ini

phase1/phase1/bpixeltools.1424344605.txt.gz · Last modified: 2015/02/19 12:16 by leac